CLEARED THE MINE FACE - Logged approx. 45,000 m3 of the mine face. Constructed timber sort yard for the mine. MULCHED THE POWERLINE RIGHTWAY/PLANT SITE - 14 kms of powerline rightway and 117 hectares of the plant site PERRY CREEK ROAD RE-ALIGNMENT - All weather road, excavated 12,146 m3 of dirt and filled with 22,700 m3 GRUBBING AND BURNING MINE FACE - Grubbed approx. 400 ha. The grubbing crews worked 23 hrs. per day, including 3 excavators and 2 D9 cats grubbing & nursing fires with 3 - 2 man burning crews. CONSTRUCTED EXPLOSIVES SITE - Mulched all immature timber off the site. Hauled and leveled crushed rock to site, surveyed and constructed drainage ditch to containment dam and landscaped site. CONSTRUCTED CONTAINMENT DAM - Cleared and burned the site for dam. Constructed dam to engineered specifications, provided field engineering staff and on-site office for crew. CONSTRUCTED ACIDIC ROCK PYRAMIDS- -Cleared and levelled site, constructed road to site, and built four pyramids consisting of 3 different layers and thickness of rock. CONSTRUCTED UPPER DIVERSION DITCH - Surveyed 1500m of diversion ditch and 150m of stilling pond. Constructed ditch and pond to engineered design.
Clearing and Grubbing approx. 22.8 hectares. Lump sum contract -Ceared the site for the crusher and wash plant facilities. Clearing approx. 150 hectares of the mine face
Lump sum contract to manufacture 31,000 cubic metres of 3/4 crushed rock. Hourly contract to provide medic services and clearing timber along the Blind Creek road. Contract to haul crushed coal to the Bullmoose load out. This was a 2 year contract involving 3 trucks hauling 24/7.
2007 - 11 Kms of Road Right-Of-Way Clearing.
© Dunne-za Ventures LP
Powered by SiteCMTM— web content management made easy by ideaLEVER Solutions.